Oakland Airport

Tank Farm S

For this project, PMI installed 450 feet of 6-inch coated and lined UG jet fuel piping. We also installed 650 linear feet of above-ground small and large bore interconnecting equipment piping, including fueling piping inside the terminal. Installation work also included 14 total pieces of equipment, including pumps, above- and below-ground tanks, strainers, separators, meters, wastewater tank, filters, and pre-filters.

Owner:
Oakland Fuel Facilities Corporation

Engineer:
August Consulting Inc.

Duration:
8 months

Total Direct Man-Hours:
2,053