Genesis Solar, Blythe, CA

PMI conducted the installation of piping, mechanical equipment, and structures in power block 1 and 2 at the Genesis Solar project.

Owner:
Genesis Solar LLC

Engineer:
Fluor

Total Direct Man-Hours:
654,000