Performance Mechanical, Incorporated

CA# 475516HI# 25121
Projects
POWER

Pacific Gas and Electric

Antioch, CA Gateway Generating Station Underground Piping and Power Train Equipment

PMI installed underground piping for two combustion turbines, two HRSGs, one steam turbine, one air cooled condenser and associated facilities for the Gateway Generating Facility. The scope of work included piping, storm drains, trench excavation, bedding, backfill, drop inlets, underground valves, fire hydrants, floor drains, manholes, and the management of Trade labor, Subcontractors and the project schedule.

We are also currently working on the installation and erection of (2) GE 7FA Gas Turbine Generators, (1) GE D11 Steam Turbine Generator and all GE accessories. The scope of work includes loading, setting, and alignment of heavy haul items, installation of piping, pipe supports, in-line instruments, steel structures, platforms, enclosures, and the management of Trade labor, Subcontractors and the project schedule.

Photo
  • Engineer: Black & Veatch
  • Approximate Contract Amount: $12.9 Million
  • Completion: June 2008
  • Duration: 21 Months
  • Total Direct Manhours: 152,200

Sacramento Municipal Utility District

Herald, CA Consumnes Power Project

Sacramento Municipal Utility District (SMUD) chose PMI to complete construction of a 500 mega watt combined cycle power plant. PMI performed the following activities to finish the project after its original General Contractor was removed from the site by the Owner:

Photo
  • Completion of two Nooter Eriksen Heat Recovery Steam Generators (HRSG's)
  • Completed piping and alignment of two GE F7A combustion turbines
  • Completed Assembly, alignment and piping of one Mitsubishi steam turbine
  • Completed installation and testing of high energy piping and supports, balance of plant and small bore piping
  • Instrumentation
  • Management of prime Electrical sub
  • Miscellaneous civil, concrete
  • Alignment and grouting of rotating equipment
  • Engineer: Utility Engineering
  • Contract Amount: $48 Million
  • Completion Date: December 2005
  • % of PMI Craft Performance: 60%

City of Burbank

Burbank, CA Magnolia Power Plant

PMI performed all piping work for a 310 mega watt combined cycle Power and Water Treatment Plant for the City of Burbank. We installed above ground and underground piping including: chrome, stainless, carpenter 20, carbon steel, PVC and cast iron. Piping was built to B31.1 and Section 1 using PMI's "PP" and "S" ASME code stamps.

Photo
  • Engineer: Kvaerner
  • Approximate Contract Amount: $21.8 Million
  • Completion: June 2005
  • Duration: 13 months

General Electric

Romoland, CA Inland Empire Energy Center

For this job we installed the Circ Water System for a seven hundred eighty mega watts Power Plant in Romoland, California.

Photo
  • Engineer: Parsons Engineering
  • Approximate Contract Amount: $3.85 Million
  • Completion: January 15, 2006
  • Duration: 5 months

Calpine

Bakersfield, CA Pastoria Power Plant

The Pastoria Power Plant in Bakersfield, California is a seven hundred mega watt power plant. We erected 3-7 FA gas turbines (GE) 1 - A-10, and 1 - D-11 steam turbines with condensers. We completed BOP piping systems, and related equipment for the entire plant.

Photo
  • Engineer: Utility Engineering
  • Approximate Contract Amount: $33 Million
  • Completion: July 2005
  • Duration: 8 months

Calpine

Antioch, CA Riverview Power Plant

PMI managed and performed all phases of construction for this fifty mega watt simple cycle peaker power plant. Activities included: planning, site preparation, excavation, civil, electrical, structural, piping, setting and assembling equipment, paving and start-up.

Photo
  • Engineer: Power Engineers
  • Approximate Contract Amount: $12 Million
  • Completion: July 2003
  • Duration: 8 months