Performance Mechanical, Incorporated
CA# 475516HI# 25121
FOOD & BEVERAGE
Food & Beverage clients
- Anheuser Busch, Inc.
- Lange Twins
- MillerCoors
- Hannah Nicole Vineyards
- Rainbow Baking
Anheuser Busch, Inc.
Van Nuys & Fairfield, CAPMI has been working with Anheuser Busch, Inc. at their Fairfield and Van Nuys locations since the mid-90s. Anheuser Busch turns to us for general maintenance construction and new construction. Some of the projects we have been involved with includes:
- Michelob Ultra Filtered Water Header Replacement
- City Water Header Replacement
- Carbon Steel Filtered Header Replacement
- Filtered Water System
- BAC Replacement
- Carbon Filtered Water Header Replacement Phase 1
- Pasteurizer Installation
- Process Piping
- Can & Bottle Line Installation
Anheuser Busch, Inc.
Fairfield, CA Can Line 40Demolition of existing depalletizer, conveyors, pasteurizer, filler, packer, seamer and associated piping and structural. Installation for new equipment, piping and conveyors.
- Approximate Contract Amount: $6.2 Million
- Completion: October 8th, 2008
Lange Twins
Acampo, CA 2008 CrushPiping and equipment for 16 new wine storage tanks.
- Approximate Contract Amount: $1.35 Million